A company needs conveying equipment to move mined materials from the quarry to t

A company needs conveying equipment to move mined materials from the quarry to t

A company needs conveying equipment to move mined materials from the quarry to the plant. design an effective and efficient belt conveyor system to meet these needs. Please refer to Table 1 for the type of material and the required conveying capacity. The material needs to be transported from the quarry to the plant, where it will be dropped into the crusher to be crushed into smaller sizes.
Conditions:
1. Make a complete and systematic design of the conveyor line, including all relevant considerations and references used.
2. Determine the boundary angle of the material to be transported from the quarry to the plant.
3. Design the conveyor line to effectively follow the ground contour.
4. Determine the width of the conveyor belt and calculate the material flow based on the capacities listed in the table below.”
Also ensure that Table 1 mentioned in the text is clearly provided for reference in the design.
Berikut ini adalah refrensi terkait mengerjakan studi kasus di atas:
Kay, M.G., 2012, Material Handling Equipment, North Carolina State University.
McGuire, P.M., 2010, Conveyors: Aplikasi, Pemilihan, dan Integrasi, CRC Press, Boca Raton, FL.
DIN 22101
ISO 5048
ISO 3435 (IS 8730)
Buku Pegangan Dunlop tentang Desain Konveyor Sabuk