Response to The Light at the End of the Tunnel and Strategies for Creating a Pos

Response to The Light at the End of the Tunnel and Strategies for Creating a Positive Corporate Culture. Ch 6 Sec 1
Responding to the PowerPoint attached
Respond to at least one of the entries with your views and observations – include a minimum of two of the following: your view of its relevance, motivate other areas where it might link to the PMBOK, how this might improve project success, the relevance to your future success. Provide no less than 200 words [include some research, citation/s, and reference/s]. 4 Points and ask at least one question at the end (1).
A maximum grade requires perfect quantity and quality. Quality includes new and relevant content, together with perfection on timing, writing, grammar, and appropriate references (if relevant).
References from course materials:
Kerzner, H. (n.d.). Project Management Best Practices : Achieving Global Excellence. in SearchWorks catalog. https://searchworks.stanford.edu/view/8627698
https://download.e-bookshelf.de/download/0000/8398/09/L-G-0000839809-0002889407.pdf
Project Management Best Practices: Achieving Global Excellence, 5th Edition. Wiley.com. (n.d.). https://www.wiley.com/en-us/Project+Management+Best+Practices%3A+Achieving+Global+Excellence%2C+5th+Edition-p-9781394179206
Project Management Institute, Inc. (2017).
A guide to the project management body of
knowledge (PMBOK® Guide)
(6th ed.). Newton
Square, PA: PMI.
https://www.slideshare.net/slideshow/pmbok6thedition-1pdf/265780437