Do a literature review an introduction and a one main point topic all 14 pages i

Do a literature review an introduction and a one main point topic all 14 pages i

Do a literature review an introduction and a one main point topic all 14 pages in total
Important Info

The order was placed through a short procedure (customer skipped some order details).
Please clarify some paper details before starting to work on the order.

Type of paper and subject
Number of sources and formatting style
Type of service (writing, rewriting, etc)

I have a dataset and I am trying to analyze it. I need someone who can understan

I have a dataset and I am trying to analyze it. I need someone who can understan

I have a dataset and I am trying to analyze it. I need someone who can understand the data and my thesis within the short period and identify questions that can help answer
Important Info

The order was placed through a short procedure (customer skipped some order details).
Please clarify some paper details before starting to work on the order.

Type of paper and subject
Number of sources and formatting style
Type of service (writing, rewriting, etc)

I need the animation (simulation) of a station of work that I have already on so

I need the animation (simulation) of a station of work that I have already on so

I need the animation (simulation) of a station of work that I have already on solidworks, I need for tecnomatix process simulation
Important Info

The order was placed through a short procedure (customer skipped some order details).
Please clarify some paper details before starting to work on the order.

Type of paper and subject
Number of sources and formatting style
Type of service (writing, rewriting, etc)

I attached my project paper and I need someone to write the literature review as

I attached my project paper and I need someone to write the literature review as

I attached my project paper and I need someone to write the literature review as per the below instructions and I’ll share some articles that you can use in the literature review.
1. Select Sources: Choose up to 20 credible and recent academic research papers published within the last 5 years.
2. Evaluate Literature: Critically assess the literature using your analytics knowledge to identify recent gaps in the field of analytics applications in engineering management.
3. Summarize Findings: Highlight key findings and their benefits.
4. Write Review: Draft the paper in IEEE format, ensuring less than 10% similarity.
5. Conclude: Provide clear conclusions and actionable recommendations based on identified opportunities.

It is a project in petroleum engineering from Heriot Watt Univercity in UK . 120

It is a project in petroleum engineering from Heriot Watt Univercity in UK . 120

It is a project in petroleum engineering from Heriot Watt Univercity in UK . 120 papers including graphes and tables . I need someone who completed similar projects and has Petroleum engineering background. I have added some examples which will help a lot and reduce the efforts and time . the Project data is also added which the entire work will be on it . the one will take the project need to provide a bi-weekly progress report to discuss and ensure all are in place . some references are added . it is better to referee to these files
Important Info

The order was placed through a short procedure (customer skipped some order details).
Please clarify some paper details before starting to work on the order.

Type of paper and subject
Number of sources and formatting style
Type of service (writing, rewriting, etc)

Overview Global Green Books Publishing (GGBP) was started two years ago by two f

Overview
Global Green Books Publishing (GGBP) was started two years ago by two f

Overview
Global Green Books Publishing (GGBP) was started two years ago by two friends, Jim King and Brad Mount, who met in college while studying in Philadelphia, PA. In the new business Jim focused on editing, sales, and marketing while Brad did the electronic assembly and publishing of books for their new company. Their business was successful and profitable in the first two years, largely due to contracts from two big businesses.
In their third year, they got very busy thanks to their third major customer, a local college that needed customized eBooks. They hired several part-time employees (mostly students) to help them with their publishing business.
But by the end of third year of operation, Global Green Books Publishing started experiencing critical problems. They were:
inability to leverage all the new employees effectively
unable to deliver eBooks to their customers on schedule
problems with providing quality texts; time and money were being spent fixing defects in their products
lack of cost control; their business was not profitable in the third year
Global Green Books Publishing saw a significant rise in issues, and several unpleasant “surprises” were cropping up; business was down as new resources were hired, and some of the projects were poorly estimated. The local university was unhappy as their eBook products reached campus late for use by professors and students. In some cases, the eBooks were a week or two late. Since the courses must start on schedule and students need their eBooks at the beginning of their courses, the new, potentially lucrative college customer was unhappy.
One of the new part-time employees hired by Jim and Brad, Samantha, had taken a project management course at college. Samantha was excited about the discipline of project management and had intentionally selected a job with Global Green Books Publishing as she saw an opportunity to polish her project management skills.
One day, Jim invited Samantha for a lunch meeting. He was aware that Samantha was familiar with project management, and wanted to hear what she had to say about the problems he and Brad were facing. Over lunch, he questioned why their small business, which had operated and implemented projects so successfully over the first two years was being challenged significantly now. He specifically listed the problems they were facing and asked for input to solve them.
Samantha asked for more time to research all the issues and later reported to the owners that Global Green Books Publishing, while being innovative, completed projects without a roadmap or a project plan and lacked a disciplined approach to project management. She noted that Jim and Brad did not use any project software for scheduling and they did not use tools or techniques to estimate, budget, or to communicate with stakeholders. Finally, they had no processes in place to manage project risks and quality.
Impressed with this and other conversations, Jim asked Samantha if she would consider being reassigned as a project manager to help them introduce workable project management practices.
Samantha accepted the offer. As her new bosses had figured out, she has several key skills; she is an excellent communicator with very good interpersonal skills and is detail-oriented. Within the first three months in her new role as PM, she introduced formal project management processes, created a PM manual, and trained the employees to get the work done successfully.
Within nine months, Samantha had fully turned things around. Due to proactive risk analysis and risk response planning, surprises and issues were greatly reduced. Communication with stakeholders was enhanced.
Brad and Jim noted that the company was delivering projects on schedule, the quality processes worked, and customers were happy with the products!
Instructions
Comment on the following aspects of the case study:
Why did Global Green Books Publishing struggle initially?
What were the specific PM solutions that were introduced by Samantha that worked?

The project focuses on a specific selective harmonic mitigation technique known

The project focuses on a specific selective harmonic mitigation technique known

The project focuses on a specific selective harmonic mitigation technique known as the three-angle control scheme. To complete this project, the instructions, concepts, and analyses detailed in each section must be followed. Finally, the provided Excel file must be completed, and the achievements must be explained in the project report in the style and format provided in this instruction manual and in the report template.

Project Report Provide a technical report which may address these in sections or

Project Report
Provide a technical report which may address these in sections or

Project Report
Provide a technical report which may address these in sections or sub-sections: introduction,
scopes, design objectives, proposed network layouts, network options/ details/ considerations,
discussions, recommendations, and conclusions. Use double-space for line separation
A technical report should have a cover page (not a cover letter) with essential items such as the
title, engineer’s name, and date. A content page(s) showing all sections (and sub-sections) and
the related page numbers. Page numbering should start only at the beginning page or
introductory page.
A conclusion section should be concise, summarizing all the main findings of your project.
The report should include all the information in writings referring to the specific numbered
tables and figures. Follow ASCE Journal Style of writing. Examples:
(1) Avoid using “I” or “we” if necessary.
(2) Place the caption of a data table on top of the table while placing the caption of a figure below
it.
Project Submission
BOTH on-campus and distance students
A submission link will appear in the Project Section of the courses site on Blackboard. Submit
your project report (including assumptions, design layout, cost calculations, etc.) in a single
PDF file before the due date.
BOTH on-campus and distance students
Select all your relevant final WaterGEMS project files and upload them in an uploading link
found in the Blackboard’s Course Project section.
Make sure that all the relevant files are copied, and the project can be run from a single folder.
How to know your submitted files will work? Before you submit, make copies of all your
final WaterGEMS files in a new folder on your computer and run WaterGEMS from this new
folder. Conduct a check to ensure that the program can run without any trouble